Case Study 02 · Vietnam → Japan

Some Products Cannot Simply Be Sourced

Developing the agricultural and manufacturing foundations for IQF ultra-thin sweet potato slices, 2020–2026.

Development from 2020/21 · Facility planning ≈2.5 years · Production from 2024 · ≈350 MT by mid-2026

A major Japanese snack and confectionery partner was looking for a Vietnamese manufacturer able to produce IQF ultra-thin sweet potato slices. The specification demanded specialized processing, and early development attempts ran into technical and manufacturing obstacles that stalled the project.

An industry contact then asked Mr. Nobuyoshi Kan for help. He identified a Vietnamese partner willing to commit to the project long-term and, over roughly two and a half years, helped coordinate the planning of the manufacturing capabilities the product required — working with Japanese and Vietnamese partners on facility and process planning, feasibility and long-term business planning.

In parallel, the partners worked in the field — soil evaluation, raw-material testing and cultivation methods — because consistent finished quality depends on the agricultural supply chain, not only the factory. Production began running in 2024, and about 350 MT had been supplied by mid-2026.

Chronology

From a stalled project to production

Years of groundwork came before the first production run. Open any stage for the detail.

  • Led by Mr. Nobuyoshi Kan
  • Japanese & Vietnamese partners
  1. 2020–2021

    RequirementLed by Mr. Nobuyoshi Kan

    A challenging requirement

    Early attempts stalled. An industry contact asked Mr. Kan for help, and he found a Vietnamese partner willing to commit long-term.

    Details
    • A demanding specification requiring specialized processing
    • Earlier development blocked by technical and manufacturing obstacles
    • A Vietnamese partner committed to long-term development
    • Commercial and manufacturing foundations coordinated
  2. ≈ 2.5 years

    Facility planningLed by Mr. Nobuyoshi Kan

    Manufacturing facility planning

    With Japanese and Vietnamese partners, Mr. Kan helped coordinate the planning of the manufacturing capabilities the product required.

    Details
    • Identifying a committed manufacturing partner
    • Supporting facility and process planning
    • Coordinating Japanese and Vietnamese teams
    • Addressing production feasibility and technical challenges
    • Advising on financial and investment considerations
    • Supporting long-term business planning
    • Aligning manufacturing development with future demand
  3. 2022

    AgricultureJapanese & Vietnamese partners

    Agricultural research & raw-material development

    The partners worked to improve sweet potato cultivation — consistent finished quality starts in the field.

    Details
    • Soil evaluation and testing
    • Raw-material quality testing
    • Cultivation-method development
    • Improving raw-material consistency
    • Studying conditions that affect processing yields
    • Aligning farming with manufacturing requirements
  4. 2024

    ProductionCommercial achievementJapanese & Vietnamese partners

    Production begins

    Production of the IQF ultra-thin slices began running.

  5. 2026

    OngoingCommercial achievementJapanese & Vietnamese partners

    Ongoing supply and development

    About 350 MT supplied cumulatively by mid-2026. Production continues, and the project remains in active development.

What it took

Building what didn't exist yet.

Partner need → a committed manufacturer → facility planning → agricultural development → production → ongoing supply.

01

Long-term manufacturing development

Staying with a difficult product over several years.

02

Agricultural supply-chain coordination

Linking soil, cultivation and raw-material quality to the factory's needs.

03

Factory planning support

Supporting facility and process planning with Japanese and Vietnamese partners.

04

Commercial feasibility

Aligning investment, production and future demand.

05

Technical problem-solving

Working through the obstacles that had stalled earlier attempts.

06

International partnership development

Keeping Japanese and Vietnamese teams aligned over years.

OMNEX coordinates documentation with the responsible manufacturers, partners and freight forwarders. Official certificates are issued by the competent authorities, and customs clearance is handled by licensed parties.

Some products cannot simply be sourced. The manufacturing capabilities, agricultural foundations and long-term partnerships must first be developed.

Our work is not finished when a supplier is introduced. We remain involved until an opportunity becomes a practical, sustainable commercial relationship.

We are not a trading company.

We are not a consulting company.

We are your partner.

Notes

Project chronology and figures are based on the project team's records. Mr. Kan's role covered coordination, planning support and advice. This project is separate from the vacuum-fried sweet potato stick project. Partner identities are confidential.